|
The Stung Treng Dam is a proposed hydroelectric dam on the Mekong River in Stung Treng Province, Cambodia. It would be located on the mainstream of the Lower Mekong River. The project is controversial for several reasons, including its possible impact on the fisheries, as well as other ecological and environmental factors. ==History== In 2007, the Russian company Bureyagesstroy got a license to conduct a feasibility study on a dam.〔 〕 The feasibility study was carried out and the company asked permission to build the hydroelectric power station.〔 〕 However, on December 9, 2009, a memorandum of understanding was signed between the Cambodian Government and the Vietnam Industrial and Urban Area Investment Development Corp (IDICO) to conduct a new feasibility study on the dam.〔 〕 The results of this survey have not been released. 抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)』 ■ウィキペディアで「Stung Treng Dam」の詳細全文を読む スポンサード リンク
|